0507329320 / 0503270296 | info@betterway.ae

Better Way
Home / Backfill

Backfill

Improved Sub-Grade or Pervious Back Fill – Any course or courses of select or improved material between the foundation soil and the sub base is usually referred to as the improved sub grade. The improved sub grade can be made up of two or more courses of different quality materials aggregate.Improved Sub-Grade or Pervious Back Fill   Any course or courses of select or improved material between the foundation soil and the sub base is usually referred to as the improved sub grade. The improved sub grade can be made up of two or more courses of different quality materials aggregate.

Better Way produces different types of improved sub-grade and capillary as per the standards of ASHTO.



Standerd

ASTM C 131, 33

 Abu Dhabi Municipality Specification, Al Ain Municipality Specification .. etc

 Department of Transportation (DOT)   Abu Dhabi

 RTA (Roads and Transportation Authority)   Dubai

 Ministry of Public Works

 According to Various Department Standards, Developers and Highway
Agencies Standards

uses

Pervious Concrete Pavement Construction
Foundation layer for road works
Drainage layer for water logged areas
Road Constructions
Dams and Reservoir
Soil Stabilizer
Canal Lining
Mass Rock Filling
Mass Concrete


Standerd

ASTM C 131, 33

 Abu Dhabi Municipality Specification, Al Ain Municipality Specification .. etc

 Department of Transportation (DOT)   Abu Dhabi

 RTA (Roads and Transportation Authority)   Dubai

 Ministry of Public Works

 According to Various Department Standards, Developers and Highway
Agencies Standards

uses

Pervious Concrete Pavement Construction
Foundation layer for road works
Drainage layer for water logged areas
Road Constructions
Dams and Reservoir
Soil Stabilizer
Canal Lining
Mass Rock Filling
Mass Concrete